We Are Close To End Of Merzifon Waste Water Treatment Plant Project

26.07.2017

We Are Close To End Of Merzifon Waste Water Treatment Plant Project

AKIN: “IT IS A SOURCE OF PRIDE FOR US”

05.01.2017

Bartın Mayor Mr. Cemal Akın, inspected Bartın Waste Water Treatment Plant which is located in Dallıca. Mayor Akın was briefed about plant processes and operation system by Consultants’s official Environmental Engineer Ms. Gonca Kaynak, Site Manager Mechanical Engineer Mr. Ersin Gezer and other technical personnel. (Summary only)

IFAT 2017

16.02.2017

We will participate in IFAT 2017 fair, Future of environmental technologies, to be organised between 16-18 February 2017 in İstanbul. Hoping to see you in our stand in Hall 11 D-25c.

TRIAL OPERATION OF BARTIN WASTE TREATMENT PLANT HAS STARTED

08.09.2016

Construction of Bartın WWTP and the Wastewater Collection, Preliminary Treatment and Sea Outfall in İnkumu project was contracted to our company by Ministry of Environment and Urbanisation Department of EU Investments. The Contract for the project was signed on 30 September 2014.

HURRıYET "TREATMENT PLANT WILL PUT AN END TO THE POLLUTION IN BARTIN RIVER

Ayhan ACAR/ BARTIN, (DHA)- Construction of BARTIN Municipality waste water treatment plant has come to end. Mayor Mr. Cemal Akın, said that with the plant being taken into operation pollution in Bartın River that leads to fish deaths will end. (Summary only)

IFAT 2016 FAIR

03.06.2016

We participated in IFAT 2016 fair, Future of environmental technologies, organised between 30 May - 03 June 2016 in Germany/Munich.

CONSTRUCTION FAIR - TURKEYBUILD İSTANBUL 2016

We participated in 39. CONSTRCUTION 2016 fair, the largest meeting of Turkish construction sector and the region, organised between 10 - 14 May 2016 in İstanbul, Büyükçekmece TÜYAP Fair Center.

EURASIA RAIL-6. International Rolling Stock, Infrastructure & Logistics Exhibition

05.03.2016

We participated in Eurasia Rail-6. International Rolling Stock, Infrastructure & Logistics Exhibition organised between 03 - 05 March 2016 in İstanbul, Yeşilköy İstanbul Fair Cebter (IFM), which has the feature of being only fair in Eurasia geography in its subject.

CONSTRUCTION OF MERZİFON WASTE WATER TREATMENT PLANT

16.12.2015

Construction of Merzifon Waste Water Treatment Plant was contracted to our company by Ministry of Environment and Urbanisation Department of EU Investments.

PRESS RELEASE: BARTIN WATER AND WASTE WATER PROJECT KICK-OFF MEETING MADE.

04.09.2015

Kick-off meeting for “Bartın Water and Waste Water Project” started with instructions of Minister of Environment and Urbanisation Mr. İdris Güllüce was held in Bartın Municipality Council Hall. Total value of the project is 16.908.081 Euro and it includes Bartın waste water treatment plant, waste water collectors, pre-treatment plant and İnsu sea outfall works. Bartın Mayor Mr. Cemal Akın, Acting Head of Ministry of Environment and Urbanisation Department of EU Investments and Counsellor to the Minister Mr. Ferruh Parmaksız, Bartın Environment and Urbanisation Provincial Director Mr. Ali Özcan, executives of the contracting and consulting companies participated in teh meeting. (Summaru only)

NEVSEHIR POTABLE WATER TREATMENT PLANT

04.02.2015

Construction of Nevşehir Potable Water Treatment Plant was contracted to our company by Ministry of Forestry and Water Affairs, General Directorate for State Hydraulic Works, Department of Potable Water.
The Contract for the project was signed on 04 February 2015.

GEZER ENDÜSTRİ İS INJECTING QUALITY TO PLASTICS

14.07.2014

GEZER Endüsri, is organising training for adding quality needed by plastics sector. Company general manager Mr. Hüseyin Gezer said ´´We have dedicated the 400 thousand Euro investment we made together with Gemrnay’s SKZ which is the expert on this area to development of the sector”.

Towards the End in Kula Potable Water Treatment Plant

03.02.2012

It is reported that the last stage has arrived in Potable Water Treatment Plant in Manisa’s Kula county. Mr. Veysel Eroğlu, Minister of Environment and Foresty, had participated in the grounbreaking ceremony and construction of the plant was contracted to Gezer Endüstri İnşaat Sanayi ve Ticaret Anonim Şirketi. (Summary only)